Finishing operations of west access road freeway of Esfahan
Project specification
Project: Finishing operations of west access road freeway of Esfahan
Project Owner: : Ministry of Roads & Urban Development
Consulting & Supervision : : Moshara and pasilo Consulting Engineers JV
End time:
Start time: 12 Aug 2012
Specifications
Operation west access road of Esfahan Freeway from Km. 75+000 to Km. 100+89 in length of 1.14 Km. including substructure, pavement construction, technical buildings, special technical buildings and hot mix asphalt according to drawings and specifications, preparing and installation guardrail installation, traffic painting and traffic signs in road tolls room
Asphalt: 106,553Ton
Concrete Work:80,929 M3
Excavation: 1,394,708M3
Steel Work: 6,167,824kg
Earth Moving: 1,333,385M3
-
Tehran-Varamin-Pishva Train sub urban rail way
Project specification
Project : Tehran-Varamin-Pishva Train sub urban rail way
Project Owner: Ministry of Roads & Urban Development
Consulting & Supervision : farbar consulting company
End time: in process
Start time: 6 Jul 2013
Specifications
1- Constriction of 5 passenger station buildings ( including all electrical mechanical utilities)
2- Approximately 50 km sub urban rail way.
3- Constriction of 12 interchanges.
Asphalt: 2.653Ton
Concrete Work: 88.916M3
Excavation: 314.673M3
Steel Work: 6.943.092kg
Earth Moving: 73.338M3
-
Engineering, procurement and Construction of Esfahan-Abnil transportation capacity incensement (2nd line) railway project
Project specification
Project: Engineering, procurement and Construction of Esfahan-Abnil transportation capacity incensement (2nd line) railway project.
Project Owner: Ministry of Roads & Urban Development
Consulting & Supervision : sahnebostan Consulting Company
End time: in process
Start time: 20 Sep 2015
Specifications
Design, procurement and execution of Esfahan-Abnil double railway project in Non-Industrial EPC Methods
Asphalt: ---
Concrete Work: 16,600M3
Excavation: 42,200M3
Steel Work: 879,000kg
Earth Moving: 571,000M3
-
Engineering, procurement and Construction of Abnil-zarin shahr transportation capacity incensement (2nd line) railway project
Project specification
Project: Engineering, procurement and Construction of Abnil-zarin shahr transportation capacity incensement (2nd line) railway project.
Project Owner: Ministry of Roads & Urban Development
Consulting & Supervision :sahnebostan Consulting Company
End time: in process
Start time: 7 Dec 2015
Specifications
Design, procurement and execution of Abnil- Zarin Shahr double railway project in Non-Industrial EPC Methods
Asphalt: ---
Concrete Work: 26,858M3
Excavation: 213,600M3
Steel Work: 2,100,000kg
Earth Moving: 269,700M3
-
Rehabilitation and Retrofitting runway surfaces and apron development of Shiraz international Airport
Project specification
Project: Rehabilitation and Retrofitting runway surfaces and apron development of Shiraz international Airport
Project Owner: Ministry of Roads & Urban Development, Iran Airport & Air Navigation Company
Consulting & Supervision : : Haraz Rah Consulting Engineers Group
End time: in process
Start time: 20 July 2014
Specification
1. Retrofitting of runway 29R & 29L
2. Retrofitting of parallel taxi way
3. New Apron construction
4. Retrofitting existence Apron
Asphalt: 100,026 Ton
Concrete Work: 20,534 M3
Excavation: 272,643 M3
Steel Work: 566,659 kg
Earth Moving: 149,306 M3