  • Finishing operations of west access road freeway of Esfahan

    Project specification

    Project: Finishing operations of west access road freeway of Esfahan

    Project Owner: : Ministry of Roads & Urban Development

    Consulting & Supervision : : Moshara and pasilo Consulting Engineers JV

    End time:

    Start time:  12 Aug 2012

    Specifications

    Operation west access road of Esfahan Freeway from Km. 75+000 to Km. 100+89 in length of 1.14 Km. including substructure, pavement construction, technical buildings, special technical buildings and hot mix asphalt according to drawings and specifications, preparing and installation guardrail installation, traffic painting and traffic signs in road tolls room

    Asphalt: 106,553Ton

    Concrete Work:80,929 M3

    Excavation: 1,394,708M3

     

    Steel Work: 6,167,824kg

    Earth Moving: 1,333,385M3

  • Tehran-Varamin-Pishva Train sub urban rail way

    Project specification

    Project : Tehran-Varamin-Pishva Train sub urban rail way         

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision : farbar consulting company

    End time: in process

    Start time:  6 Jul 2013

    Specifications

    1-     Constriction of 5 passenger station buildings ( including all electrical mechanical utilities)   

    2-      Approximately 50 km sub urban rail way.

    3-       Constriction of 12 interchanges.   

    Asphalt: 2.653Ton

    Concrete Work: 88.916M3

    Excavation: 314.673M3

     

    Steel Work: 6.943.092kg

    Earth Moving: 73.338M3

  • Engineering, procurement and Construction of Esfahan-Abnil transportation capacity incensement (2nd line) railway project

    Project specification

    Project: Engineering, procurement and Construction of Esfahan-Abnil transportation capacity incensement (2nd line) railway project.

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision : sahnebostan Consulting Company

    End time: in process

    Start time:  20 Sep 2015

    Specifications

    Design, procurement and execution of Esfahan-Abnil double railway project in Non-Industrial EPC Methods

    Asphalt: ---

    Concrete Work: 16,600M3

    Excavation: 42,200M3

     

    Steel Work: 879,000kg

    Earth Moving: 571,000M3

  • Engineering, procurement and Construction of Abnil-zarin shahr transportation capacity incensement (2nd line) railway project

    Project specification

    Project: Engineering, procurement and Construction of Abnil-zarin shahr transportation capacity incensement (2nd line) railway project.

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision :sahnebostan Consulting Company

    End time: in process

    Start time:  7 Dec 2015

    Specifications

    Design, procurement and execution of Abnil- Zarin Shahr double railway project in Non-Industrial EPC Methods

    Asphalt: ---

    Concrete Work: 26,858M3

    Excavation: 213,600M3

     

    Steel Work: 2,100,000kg

    Earth Moving: 269,700M3

  • Rehabilitation and Retrofitting runway surfaces and apron development of Shiraz international Airport

    Project specification

    Project: Rehabilitation and Retrofitting runway surfaces and apron development of Shiraz international Airport

    Project Owner: Ministry of Roads & Urban Development, Iran Airport & Air Navigation Company

    Consulting & Supervision : : Haraz Rah Consulting Engineers Group

    End time: in process

    Start time:  20 July 2014

    Specification

     

    1. Retrofitting of runway 29R & 29L

    2. Retrofitting of parallel taxi way

    3. New Apron construction

    4. Retrofitting existence Apron  

    Asphalt: 100,026 Ton

    Concrete Work: 20,534 M3

    Excavation: 272,643 M3

     

    Steel Work: 566,659 kg

    Earth Moving: 149,306 M3