  • Rehabilitation and Retrofitting, Shiraz-Safashahr Highway

    Project specification:

    Project: Rehabilitation and Retrofitting, Shiraz-Safashahr Highway

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision : tadbir Consulting Company

    End time: 21 Nov 2010

    Start time:  11 Mar 2007

    Specifications:

    Retrofitting Shiraz-SafaShahr Highway with the length of 180 Km. from Shiraz to SafaShahr, return way from SafaShahr to Shiraz including excavation, dressing asphalt, patching, crack filing, asphalt leyars, technical buildings, and traffic sign.    

    Asphalt:894,356 Ton

    Concrete Work:139 M3

    Excavation:8,867M3

     

    Steel Work:408 kg

    Earth Moving:---

  • Rehabilitation and Retrofitting for Meimeh-Salafchegan Highway, Part I

    Project specification

    Project: Rehabilitation and Retrofitting for Meimeh-Salafchegan Highway, Part I

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision :iran oston Consulting Company

    End time: 12 Jun 2001

    Start time:  29 Dec 1996

    Specifications

    Hot Mix Asphalt, a section  of Meimeh-Salafchegan in present road in length of 40.800  Km. of Km. 100+000

    Asphalt: 192.853Ton

    Concrete Work: ---

    Excavation: ---

     

    Steel Work: ---

    Earth Moving: ---

  • (Rehabilitation and Retrofitting for Meimeh-Salafchegan Highway, Part II (A

    Project specification:

    Project: Rehabilitation and Retrofitting for Meimeh-Salafchegan Highway, Part II (A)

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision : Iran oston Consulting Company

    End time: 16 Jul 2002

    Start time:  8 Jan 1997

    Specifications:

    Hot Mix Asphalt Lining, a section of Meimeh-Salafchegan in present road in length of 50 Km. of Km. 50+000 to Km. 100+000

    Asphalt: 177,487Ton

    Concrete Work: ---

    Excavation: 444

     

    Steel Work: ---

    Earth Moving: ---

  • (Rehabilitation and Retrofitting for Meimeh-Salafchegan Highway, Part II (B

    Project specification

    Project: Rehabilitation and Retrofitting for Meimeh-Salafchegan Highway, Part II (B)

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision : iran oston Consulting Company

    End time: 2 Jul 2002

    Start time:  8 Jan 1997

    Specifications

    Hot Mix Asphalt Lining, a section of Meimeh-Salafchegan in present road in 50  Km. of Km. 0+000 to Km. 50+000

    Asphalt:209.116 Ton

    Concrete Work: ---

    Excavation: 888M3

     

    Steel Work: ---

    Earth Moving: ---

  • Rehabilitation and Retrofitting Meimeh-Alavijeh (East Band) T-way

    Project specification:

    Project: Rehabilitation and Retrofitting Meimeh-Alavijeh (East Band) T-way

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision : iran oston Consulting Company

    End time: 7 Nov 2002

    Start time:  10 Jan 1999

    Specifications:

    Hot mix asphalt lining of east band, Meimeh-Alavijeh Three-Way with length of 60 Km. traffic painting and widening the road in the present and operations relevant to 15 Km. of end of way  

    Asphalt: 167.504Ton

    Concrete Work: 948M3

    Excavation: 156.210M3

     

    Steel Work:5.640 kg

    Earth Moving: 117.171M3

  • (salafchegan-arak highway ( rahjerd variation

    Project specification

    Project: salafchegan-arak highway ( rahjerd variation)    

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision :

    End time: 5 Sep 2000

    Start time: 7 Dec 1998

    Specifications      :

    Variant construction of the road in Dehjerd between Km. 46+400 and Km. 55+360 in one band relevant to Arak-Salafchegan Main Road Part IV (2nd Band on the left side from Arak)

    Asphalt: 61.600Ton

    Concrete Work: 20.626M3

    Excavation: 179.124M3

     

    Steel Work:358.818 kg

    Earth Moving: 649.052M3

  • Arak-Salafchegan Highway, Part III

    Project specification

    Project; Arak-Salafchegan Highway, Part III 

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision :

    End time: 12 Nov 2001

    Start time:  25 Jul 1999

    Specifications

    Arak-Salafchegan 4-Band Highway, Part III between Km. 5+430 to Km. 27+500 with length of 22.1 Km. including substructure and pavement construction, technical buildings and hot mix asphalt lining according to drawings and specifications, guardrail installation, traffic painting and traffic signs for operation and finishing 

    Asphalt: 86,845 Ton

    Concrete Work: 13,234M3

    Excavation: 133,698M3

     

    Steel Work:284,703 kg

    Earth Moving: 246,877M3

  • Arak-Salafchegan Highway, Part III

    Project specification

    Project: Arak-Salafchegan Highway, Part III

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision 

    End time: 12 Nov 2001

    Start time:  12 Sep 2000

    Specifications:

    Arak-Salafchegan 4-Band Highway, between Km. 5+430 to Km. 27+500 including substructure and pavement construction, technical buildings and hot mix asphalt lining according to drawings and specifications, guardrail installation, traffic painting and traffic signs for operation and finishing

    Asphalt: 57,350Ton

    Concrete Work: 391M3

    Excavation: 30,341M3

     

    Steel Work: ---

    Earth Moving: 130,933M3

  • Neyzar Bridge constriction and, Meimeh-Salafchegan Highway, 2nd Band asphalt

    Project specification

     Neyzar Bridge constriction and, Meimeh-Salafchegan Highway, 2nd Band asphalt:Project

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision : iran oston consulting company

    End time: 19 Jun 2000

    Start time:  27 Jan 1997

    Specifications

    asphalt, a section of Part V, Part VI (A) & Part VI (B), Construction of Neyzar Bridge in the 2nd Band, Meimeh-Salafchegan Highway  

    Asphalt: 157,884Ton

    Concrete Work: 5,526M3

    Excavation: 34,727M3

     

    Steel Work: ---

    Earth Moving: 11,375M3

  • Meimeh-Delijan-Salafchegan Highway, 2nd Band, Part V

    Project specification

    Project: Meimeh-Delijan-Salafchegan Highway, 2nd Band, Part V

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision : iran oston consulting company

    End time: 28 Sep 1999

    Start time:  8 Mar 1997

    Specifications

    Construction of Part V, 2nd Band of Meimeh-Delijan-Salafchegan Highway from Km. 0+000 to Km. 19+000 Part III in 19 Km. including substructure and pavement (excluding asphalt)  and technical buildings throughout the way

    Asphalt: ---

    Concrete Work: 23,705M3

    Excavation: 76,952M3

     

    Steel Work: ---

    Earth Moving: 322,301M3

  • Meimeh-Salafchegan Highway, 2nd Band, Part IV & a section of Part V

    Project specification

    Project: Meimeh-Salafchegan Highway, 2nd Band, Part IV & a section of Part V

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision : iran oston consulting company

    End time: 27 Sep 1999

    Start time:  27 Jan 1997

    Specifications

    Highway construction and asphalt Part IV, 2nd Band of Meimeh-Delijan-Salafchegan Highway in length of 385.22 Km. (including Part I of Km. 0+000 to Km. 3+187, Part II of Km. 0+000 to Km. 19+1999) and a section of Part V in 16 Km. (from Km. 0+000 to Km. 16+000 Part III), in total 386.38 Km. including hot mix asphalt, traffic painting and traffic signs and guardrail installation    

    Asphalt: 186.090Ton

    Concrete Work: ---

    Excavation: ---

     

    Steel Work: ---

    Earth Moving: ---