  • Operation of west access road for freeway of Esfahan

    Project specification

    Project: Operation of west access road for freeway of Esfahan 

    Project Owner: Ministry of Roads & Urban Development

    Consulting & Supervision : : Moshara and pasilo Consulting Engineers JV

    End time: 18 Feb 2009

    Start time:  16 Mar 2004

    Specifications

    Operation of the West Access Road of Esfahan Freeway from Km. 0+000 to Km. 94+770 in length of 770.94 Km. including substructure, pavement construction, technical buildings, special technical buildings including non-leveled bridge and hot mix asphalt according to drawings and specifications, preparing and installation guardrail installation, traffic painting and traffic signs in Phase 1 & 2 in 78 Km. and road tolls room section in Phase 1

    1. Najafabad non-leveled intersection, two bridge in length of 66 and with the width of 12 m.

    2. Gavpiseh non-leveled intersection, two bridge in length of 117 and with the width of 12 m. 

    Asphalt: 645,311Ton

    Concrete Work:127,483 M3

    Excavation: 2,219,228M3

     

    Steel Work: 4,901,492kg

    Earth Moving: 6,340,346M3

  • Finishing operations of west access road freeway of Esfahan

    Project specification

    Project: Finishing operations of west access road freeway of Esfahan

    Project Owner: : Ministry of Roads & Urban Development

    Consulting & Supervision : : Moshara and pasilo Consulting Engineers JV

    End time:

    Start time:  12 Aug 2012

    Specifications

    Operation west access road of Esfahan Freeway from Km. 75+000 to Km. 100+89 in length of 1.14 Km. including substructure, pavement construction, technical buildings, special technical buildings and hot mix asphalt according to drawings and specifications, preparing and installation guardrail installation, traffic painting and traffic signs in road tolls room

    Asphalt: 106,553Ton

    Concrete Work:80,929 M3

    Excavation: 1,394,708M3

     

    Steel Work: 6,167,824kg

    Earth Moving: 1,333,385M3