Operation of west access road for freeway of Esfahan
Project specification
Project: Operation of west access road for freeway of Esfahan
Project Owner: Ministry of Roads & Urban Development
Consulting & Supervision : : Moshara and pasilo Consulting Engineers JV
End time: 18 Feb 2009
Start time: 16 Mar 2004
Specifications
Operation of the West Access Road of Esfahan Freeway from Km. 0+000 to Km. 94+770 in length of 770.94 Km. including substructure, pavement construction, technical buildings, special technical buildings including non-leveled bridge and hot mix asphalt according to drawings and specifications, preparing and installation guardrail installation, traffic painting and traffic signs in Phase 1 & 2 in 78 Km. and road tolls room section in Phase 1
1. Najafabad non-leveled intersection, two bridge in length of 66 and with the width of 12 m.
2. Gavpiseh non-leveled intersection, two bridge in length of 117 and with the width of 12 m.
Asphalt: 645,311Ton
Concrete Work:127,483 M3
Excavation: 2,219,228M3
Steel Work: 4,901,492kg
Earth Moving: 6,340,346M3
-
Finishing operations of west access road freeway of Esfahan
Project specification
Project: Finishing operations of west access road freeway of Esfahan
Project Owner: : Ministry of Roads & Urban Development
Consulting & Supervision : : Moshara and pasilo Consulting Engineers JV
End time:
Start time: 12 Aug 2012
Specifications
Operation west access road of Esfahan Freeway from Km. 75+000 to Km. 100+89 in length of 1.14 Km. including substructure, pavement construction, technical buildings, special technical buildings and hot mix asphalt according to drawings and specifications, preparing and installation guardrail installation, traffic painting and traffic signs in road tolls room
Asphalt: 106,553Ton
Concrete Work:80,929 M3
Excavation: 1,394,708M3
Steel Work: 6,167,824kg
Earth Moving: 1,333,385M3